Skip to content

Reporting periods

Reporting periods are a fundamental feature that allows organizations to track and analyze their greenhouse gas (GHG) emissions over specific time frames. This feature enables multi-period emissions tracking, year-over-year comparisons, and compliance with GHG Protocol reporting requirements.

What is a Reporting Period?

A reporting period is a defined timeframe during which an organisation measures and reports its GHG emissions. Common reporting periods include:

  • Annual periods (e.g., “2024”, “FY 2024”)
  • Quarterly periods (e.g., “Q1 2024”, “Q2 2024”)
  • Custom periods for specific reporting needs

Period Properties

Each reporting period has the following attributes:

  • Name: A descriptive identifier (e.g., “2024”, “Q1 2024”)
  • Start Date: The first day of the reporting period
  • End Date: The last day of the reporting period
  • Status: The current state of the period
  • Draft: Period is being set up
  • Active: Period is currently in use
  • Closed: Period is finalized and locked
  • Baseline Flag: Indicates if this period serves as the baseline for comparisons

Period Selection

When a project has multiple reporting periods:

  1. A period switcher appears in the project header
  2. The currently selected period is displayed with a dropdown arrow
  3. Users can click to see all available periods and switch between them
  4. The selected period persists throughout the user’s session

When a project has only one reporting period:

  • The period dates are shown without a switcher
  • This maintains a clean interface for simple use cases

Data Association

All emissions data is linked to specific reporting periods:

  • Activity Data: Electricity consumption, fuel use, travel, etc.
  • Fleet Data: Vehicle fuel and electricity consumption
  • Procurement Data: Purchased goods and services
  • Investment Data: Portfolio emissions valuations

When creating new records, the system automatically assigns them to the currently selected reporting period.

Data Validation

The system ensures data integrity by validating that:

  • Activity dates fall within the assigned reporting period
  • No data can be created outside of defined reporting periods
  • Overlapping periods are prevented for the same project

Emissions Data Entry

When entering emissions data:

  • New records are automatically assigned to the current reporting period
  • Date fields are validated against the period’s date range
  • Users see a blue banner indicating which period they’re working in

Reports and Analytics

Reports automatically filter data based on the selected period:

  • Overview Dashboard: Shows emissions totals for the current period
  • Category Reports: Display only activities within the selected period
  • Charts and Visualizations: Reflect data from the current period
  • Country Analysis: Aggregates emissions by country for the selected period

Data Queries

All data queries throughout the system respect the current reporting period:

  • List views show only records from the selected period
  • Calculations use period-specific data
  • Exports include only data from the current period

Creating a New Period

  1. Navigate to Project Settings → Reporting Periods
  2. Click “Add Period”
  3. Enter the period details:
  4. Name (e.g., “2025”)
  5. Start and end dates
  6. Status (typically start with “Draft”)
  7. Baseline flag (if applicable)

Setting a Baseline Period

One period can be designated as the baseline:

  • Used for year-over-year comparisons
  • Serves as the reference point for reduction targets
  • Marked with a blue “Baseline” badge

Period Transitions

When transitioning between periods:

  • Complete all data entry for the current period
  • Change the period status to “Closed” to prevent changes
  • Create and activate the new period
  • Assets and emission sources automatically carry forward

Planning Periods

  • Align reporting periods with your organization’s fiscal year
  • Create periods in advance to allow for planning
  • Use consistent naming conventions (e.g., always use “YYYY” for annual periods)

Data Management

  • Complete data entry before closing a period
  • Review and validate data before marking a period as “Closed”
  • Use the baseline period for setting reduction targets

Multi-Period Analysis

  • Keep period names consistent for easier comparison
  • Use the period switcher to review historical data
  • Export period-specific reports for compliance documentation